Sunday, August 15, 2010
Independence on Independence Day
First sessional examinations are postponed to September 7 to September 9, 2010.
Saturday, May 29, 2010
WC book, finally out
hey guys.
For the last two years, all that my dad had talked about was his book, which he was writing. It gets really irritating sometimes, only me and my family could tell. But finally, after so much hard work, and waiting, it is finally out. And now, looking the joy on his face made me realize how important it was for him. I also feel the same joy when I do programming and succeed in my work. But, this is really big. It is titled - "Wireless Communications", useful for ECE students in 3rd and 4th year. And most importantly, can you guess who is the publisher? Its 'Tata Mc-Graw Hill', one of the leading publishers internationally. Its really amazing and the feeling is truly great. I feel so proud.
As a part of web supplements provided along with the book and also for marketing purpose, I have created an interactive quiz having questions from the text of the book. It is available at following URL: www.wcquiz.blogspot.com Please visit it, and send me your views at my email address progpank@gmail.com
Pankaj
For the last two years, all that my dad had talked about was his book, which he was writing. It gets really irritating sometimes, only me and my family could tell. But finally, after so much hard work, and waiting, it is finally out. And now, looking the joy on his face made me realize how important it was for him. I also feel the same joy when I do programming and succeed in my work. But, this is really big. It is titled - "Wireless Communications", useful for ECE students in 3rd and 4th year. And most importantly, can you guess who is the publisher? Its 'Tata Mc-Graw Hill', one of the leading publishers internationally. Its really amazing and the feeling is truly great. I feel so proud.
As a part of web supplements provided along with the book and also for marketing purpose, I have created an interactive quiz having questions from the text of the book. It is available at following URL: www.wcquiz.blogspot.com Please visit it, and send me your views at my email address progpank@gmail.com
Pankaj
Monday, May 10, 2010
Tuesday, April 20, 2010
Microcontroller Lab - PLC experiment
Exp 1 - Introduction to PLC
Exp 2,3 - Any two programs using ladder logic, write steps to follow in RSLogix software.
Submit by 10:30 am, April 21 (Wednesday)
Exp 2,3 - Any two programs using ladder logic, write steps to follow in RSLogix software.
Submit by 10:30 am, April 21 (Wednesday)
Monday, April 12, 2010
Wednesday, April 7, 2010
CAPSA Problem No. 8 - SIMULINK
PROBLEM NO. 8
Objective:
Using SIMULINK, design and simulate a two-area power system model connected by a tie line.
Problem:
A two area system connected by a tie line has the following parameters on a 1000-MVA common base
AREA 1
Speed Regulation
R1 = 0.05
Frequency-sensitive load coefficient
D1 = 0.6
Inertia Constant
H1 = 5
Base power
1000 MVA
Governor time constant
τg1 = 0.2 sec
Turbine time constant
τT1 = 0.5 sec
AREA 2
Speed Regulation
R2 = 0.0625
Frequency-sensitive load coefficient
D2 = 0.9
Inertia Constant
H2 = 4
Base power
1000 MVA
Governor time constant
τg2 = 0.3 sec
Turbine time constant
τT2 = 0.6 sec
Objective:
Using SIMULINK, design and simulate a two-area power system model connected by a tie line.
Problem:
A two area system connected by a tie line has the following parameters on a 1000-MVA common base
AREA 1
Speed Regulation
R1 = 0.05
Frequency-sensitive load coefficient
D1 = 0.6
Inertia Constant
H1 = 5
Base power
1000 MVA
Governor time constant
τg1 = 0.2 sec
Turbine time constant
τT1 = 0.5 sec
AREA 2
Speed Regulation
R2 = 0.0625
Frequency-sensitive load coefficient
D2 = 0.9
Inertia Constant
H2 = 4
Base power
1000 MVA
Governor time constant
τg2 = 0.3 sec
Turbine time constant
τT2 = 0.6 sec
The units are operating in parallel at the nominal frequency of 60 Hz. The synchronizing power coefficient is computed from the initial operating condition and is given to be Ps = 2.0 per unit. A load change of 187.5 MW occurs in area 1. Construct the SIMULINK block diagram and obtain the frequency deviation response.
Subscribe to:
Posts (Atom)